Cut energy intensity per unit produced
Reduce energy intensity from 2.8 to 1.9 kWh per unit produced
Owner
Energy Manager
Target
1.9 kWh/unit (↓ from 2.8)
Progress
58%Reduce the total plant energy index from 100 to 76 (baseline-normalised)
Owner
Facilities Manager
Target
76 total plant energy index (↓ from 100)
Progress
44%Raise sub-metered energy coverage from 58% to 100% of major loads
Owner
Energy Manager
Target
100% sub-metered coverage
Progress
50%