Even out workload across every station on the line
Reduce station-time imbalance from 34% to 12%
Owner
Industrial Engineer
Target
12% station-time imbalance (↓ from 34%)
Progress
59%Raise the line smoothness index from 0.62 to 0.94
Owner
Industrial Engineer
Target
0.94 line smoothness index
Progress
44%Reduce the number of stations running over takt from 5 to 1
Owner
Process Engineer
Target
1 station over takt (↓ from 5)
Progress
50%