Know exactly where every project stands
See cost, schedule, and scope performance in one view so you never discover problems after it is too late to act.
Enterprise Grade Security
Keep your company’s data secure and compliant with industry-leading security standards and certifications.
What changes when every project has real data
Most teams find out a project is over budget at the end. Here is what that looks like, and what it looks like with Profit.co.
- ✕ Cost and schedule health live in separate spreadsheets with no single view.
- ✕ Status reports say on track while real spend quietly exceeds the budget.
- ✕ Portfolio reviews happen without knowing which projects are actually at risk.
- ✕ Recovery options disappear because problems surface too late to fix.
- ✓ CPI, SPI, and TCPI update automatically at every review cycle. No manual work.
- ✓ The 2×2 performance matrix flags at-risk projects before they become problems.
- ✓ Portfolio EVM rolls up every project into one executive health view.
- ✓ TCPI shows what recovery requires while you still have time to act.
Built for every project, at every level
Real numbers, calculated automatically, at project and portfolio level.
Three numbers that tell the whole story
CPI, SPI, and TCPI calculate automatically from your project data. The 2×2 matrix maps every project to its exact health quadrant at a glance.

See performance trends across the full timeline
Plot Planned Value, Actual Cost, and Earned Value month by month. Track whether project efficiency improves or declines before it becomes a board-level problem.

Roll up EVM across every project at once
See combined cost and schedule health across your full portfolio. Spot which projects need attention before a review meeting, not during one.

Your AI finds the right goals to align to
The Alignment Agent scores and surfaces the most relevant OKRs for each goal so no one wastes time guessing where their work fits.
Suggests which OKRs are the best fit to align your goal to, ranked by relevance.
Scores each suggestion on Strategic Relevance, Cross-dept Impact, and Outcome Contribution.
Flags goals that have no parent and no connection to anything strategic.
Spots teams with no goals connected to company-level priorities.
Every EVM tool you need, in one place
Built for project managers, PMO leaders, and executives who need accurate data fast.
Baseline Lock
Export Reports
Real-Time Calc
VAC Tracking
AC Tracking
EAC Forecast
PMI-Aligned Reports
Role-Based Access
Highly Rated by Our Users
A comprehensive solution with advanced features to manage your projects from start to finish, ensuring team alignment and goal achievement.
Every OKR tool works better together
Profit.co features connect so your dashboards, alignment, and reporting all run as one system.
Connect Enterprise Portfolio Management to every corner of the business
Profit.co brings strategy roadmaps, execution tracking, and AI agents together so every project investment connects to the strategy it supports.
Visualise strategic themes alongside the portfolio investments backing them. Leadership always sees which initiatives tie to which priorities.
Link every project to corporate objectives and track delivery against them. Full traceability from capital committed to outcome achieved.
AI Agents accelerate project creation and structuring so your team spends less time on setup and more time on governance.
See Profit.co EVM Dashboard in action
Walk away with a live view of your project health and a clear picture of what to fix first.
Rated 4.7/5 by 500+ PMO Leaders on
The Solution
Integrate With Your Favourite Apps
We integrate with Jira, Slack, G Suite, Zapier, Teams, Office 365, and 100+ Integrations. Connect with Profit.co OKR Software to integrate users, tasks, and also check in your key results within the apps.
Have questions?
We got answers.
EVM Dashboard is Profit.co’s earned value management view for project and portfolio managers. It combines cost, schedule, and scope performance into a single live view showing CPI, SPI, TCPI, and the 2×2 performance matrix. No spreadsheets required.
Yes. EVM Dashboard works at both project and portfolio level. A single project manager gets full CPI, SPI, and TCPI visibility for their project. A PMO leader or executive sees the same data rolled up across every project in the portfolio at once.
Yes. All EVM metrics — CPI, SPI, TCPI, CV, SV, EAC, VAC, and AC — calculate automatically at every review cycle. No manual data entry. No spreadsheet formulas. The 2×2 matrix and trend charts update without any action from your team.
Lock the approved budget using the Performance Measurement Baseline. When scope changes, update the baseline and Profit.co keeps a full audit trail. All EVM metrics recalculate from the new baseline automatically so your data stays accurate.
Yes. Start a free trial from this page with no credit card required. You get full access to EVM Dashboard and all other Profit.co features. Book a demo if you prefer a guided walk-through with your own project data.
Most teams see live EVM data within one day. Connect your project data, set your budget baselines, and the dashboard populates automatically. Integrations with Jira and Azure DevOps mean you do not need to start from scratch.
Yes. Role-based access controls let you decide exactly who sees which project data. Project managers see their own full EVM view. Executives see the portfolio rollup. You control what each role can access, edit, or export.
Profit.co connects with Jira, Slack, Microsoft Teams, Azure DevOps, and Salesforce out of the box. Your project data syncs automatically so EVM metrics always reflect the latest state. No manual exports or duplicate data entry required.
Can’t find the answer you need?
Get in touch with us — we’re happy to assist you!